The Gallery Farm

Building resilience at The Gallery Farm

The 2019 bushfires are a big part of why we're doing this. We're building a water system that supplies the cattle day to day and gives us more options as we prepare for bushfire season. The header tank is already in place. The next stages are connecting the dam pump, adding the distribution pump and pipework, and installing Firerite guttering.

We want other farmers and rural property owners to see how the setup comes together on a working farm. On demonstration days, we'll walk through how we move water from the dam to storage, how we distribute it, and why we're building the system in stages. We'll share what we learn so people can decide what suits their own property.

We'll show how we're setting up and testing the system, including how we check that the pumps start on backup power and that water reaches the outlets where it's needed. The aim is to help other property owners plan for what could fail and build in practical backups of their own.

We chose MGT because we want a pump drive that's straightforward to maintain and ready when we need it. The magnetic gears transfer drive without touching, removing one source of wear. That matters when we're pumping water for the cattle day after day, and it's one of the reasons we're demonstrating MGT as part of our broader bushfire preparedness work.

Bushfire burning through eucalyptus trees at The Gallery Farm in 2019
The 2019 bushfires at The Gallery Farm

Water storage & supply

Water storage and supply

Our 25,000-litre header tank is in place near the cattle yards. We plan to use the solar-powered MGT30 to pump water from the dam into the tank. From there, the new pipework will distribute water around the farm, starting with the cattle troughs.

The MGT30 can run from solar or battery power. Battery backup gives us another way to run the pump when sunlight is limited. The electric drive is designed to respond as soon as it's switched on, with no fuel to store or engine to start.

See the MGT30 pump
25,000-litre header tank at The Gallery Farm with cattle yards and farm infrastructure visible
25,000-litre header tank at The Gallery Farm

Distribution pump

Header tank distribution pump

A larger pump is in development, with installation planned for early 2027. The MGT30 will fill the header tank from the dam. The larger pump will draw from the tank and pressurise the distribution lines. We plan to use it to supply dedicated firefighting hose outlets, a sprinkler line and irrigation.

Tirrana pump range — industrial progressive cavity pumps in orange
Tirrana pump range shown for reference. The Gallery Farm pump is in development.

Power & backup

Solar, battery and generator backup

The Gallery Farm already has a 30 kW solar and battery system, backed by a generator that cuts in automatically when needed. We plan to expand solar and battery capacity as we fit out the showroom.

The electric pumps are designed to start on demand, with no need to start or refuel an engine at the pump. Having solar, battery and generator power gives us several ways to keep essential equipment running when mains power is interrupted.

On demonstration days, we'll show how we set up and test each layer of backup, from the power supply to the pump and water outlets. We want other property owners to see how they can build and test a setup that's as dependable as possible for their own place.

Sungrow inverter and battery storage at The Gallery Farm
Sungrow inverter and battery storage at The Gallery Farm

Bushfire preparedness

Firerite guttering

Our Firerite guttering is being made for The Gallery Farm in COLORBOND® Woodland Grey, with installation planned for early 2027. It's part of our bushfire preparedness work. We'll share photos of the farm's installation once it's in place.

Firerite demonstration unit in operation — roof section with sprinkler spray active
Firerite demonstration unit in operation

Explore more